Allied Telesyn International Corp AT-WA7500 Installation Guide Page 28

  • Download
  • Add to my manuals
  • Print
  • Page
    / 51
  • Table of contents
  • BOOKMARKS
  • Rated. / 5. Based on customer reviews
Page view 27
14
5. Attach the data cables to the switch ports. Do
not use a cross-over cable to connect
workstations or servers to ports 1 through 5.
Do not use a cross-over cable to connect
another switch or hub to the Uplink port.
Note
You can use either port 5 or the Uplink
port on an AT-FS705LE switch, but you
cannot use both simultaneously.
6. Go to the procedure Verifying and
Troubleshooting the Installation on page 16.
Installing the Unit on a Wall
For wall-mount installation, you can position
the switch vertically or horizontally on the wall
using the keyhole cutouts in the bottom of the
switch chassis.
1. If previously attached, remove the rubber feet
and all cables and the DC power cord from the
switch.
2. Select a wall location for the switch.
Page view 27
1 2 ... 23 24 25 26 27 28 29 30 31 32 33 ... 50 51

Comments to this Manuals

No comments