Allied Telesyn International Corp AT-810SL User Manual Page 30

  • Download
  • Add to my manuals
  • Print
  • Page
    / 52
  • Table of contents
  • BOOKMARKS
  • Rated. / 5. Based on customer reviews
Page view 29
Operation
10
Figure 6 details the rear panel.
Figure 6: Rear Panel Switches
SQE Test Switch
Located on the back panel as shown in Figure 6, the SQE TEST SWITCH is an
ON or OFF user-selectable slide switch which is independent of the attached
MAU. This switch will also function in both local and remote mode of
operation.
You have the option to place the SQE Test slide switch either ON or OFF,
depending on your application. If ON, it means that the SQE Test is provided
to any DTE (or workstation) that is connected to one of the local eight
transceiver ports.
Status Indicators
The AT-810SL has LEDs to aid in installing, operating and troubleshooting
the fanout. These LEDs also serve to verify correct transceiver operation at a
glance. The following information is a description of their location, grouping
and functionality.
Page view 29
1 2 ... 25 26 27 28 29 30 31 32 33 34 35 ... 51 52

Comments to this Manuals

No comments